Problem Solving (PS) | Re: Machine A can do a job in 24 hours at a constant rate and machine A do

$
0
0
MathRevolution wrote:

Machine A can do a job in 24 hours at a constant rate. If Machine A does the job for 8 hours and Machine B does the rest of the job, which works at 2/3 constant rate of Machine A. How long will it take for Machine B alone to do the rest of the job?

A. 12hrs
B. 16hrs
C. 24hrs
D. 28hrs
E. 32hrs


The rate of machine A is 1/24, so in 8 hours 1/3 of the job is completed, and thus 2/3 of the job is left to be completed.

If the rate of machine B is 2/3 that of machine A, then
...