ScottTargetTestPrep wrote:
AbdurRakib wrote:
Each type A machine fills 400 cans per minute,each Type B machine fills 600 cans per minute,and each Type C machine installs 2,400 lids per minute.A lid is installed on each can that is filled and on no can that is not filled.For a particular minute,what is the total number of machines working?
(1) A total of 4,800 cans are filled that minute
(2) For that minute,there are 2 Type B machines working for every Type C machine working
(1) A total of 4,800 cans are filled that minute
(2) For that minute,there are 2 Type B machines working for every Type C machine working
We are given that each Type A machine fills 400
...





