Let Ra be the rate of Machine A and Rb be the rate of Machine B, and Ta be the time for Machine A to produce 1 widget.
Ra + Rb = 1/3 widget in 1 hour
2Ra + Rb = 1/2 widget in 1 hour
Therefore what is Ta to produce 1 widget? Find Ta
Therefore Rb = 1/3-Ra
Therefore 2Ra + 1/3 - Ra = 1/2
Ra = 1/2 - 1/3
Ra = 1/6 of a widget in 1 hour
Therefore it takes 6 hours for Machine A to produce 1 widget.
Therefore E.
Ra + Rb = 1/3 widget in 1 hour
2Ra + Rb = 1/2 widget in 1 hour
Therefore what is Ta to produce 1 widget? Find Ta
Therefore Rb = 1/3-Ra
Therefore 2Ra + 1/3 - Ra = 1/2
Ra = 1/2 - 1/3
Ra = 1/6 of a widget in 1 hour
Therefore it takes 6 hours for Machine A to produce 1 widget.
Therefore E.









